Published

Three things separate a solar company that can be checked from one that cannot: a named engineer registered with ETEK who signs the design, a licensed electrical contractor who does the fixed wiring, and a written quote stating who applies for the grid connection. Panel brand, inverter brand and promised annual output are either negotiable or unverifiable at the moment of signing. The three above are documents, and documents can be read before money moves.

Cyprus has no shortage of installers. The market grew quickly, and it mixes established electrical contractors, roofing firms that added panels, and resellers who subcontract every part of the job. All three can deliver a working system. Only some will still hold the paperwork in year four.

What can actually be verified

Claims made by a solar company fall into three groups, and it is worth sorting them before comparing anything.

The first group is documented and checkable in an afternoon. The legal entity exists at the Registrar of Companies under the name that will appear on the invoice. The engineer signing the design is registered with ETEK in the relevant discipline. The electrical work runs under a licensed electrical contractor. Public liability insurance is in force on the dates the scaffold goes up, not merely at some point in the past.

The second group is checkable only after the fact: generation against the estimate, how quickly a fault is attended, whether soiling losses were explained honestly. No sales meeting settles these.

The third group cannot be checked at all. Payback figures, lifespan claims and bill-reduction percentages depend on a household's consumption pattern and on tariff decisions nobody controls. A company presenting them as certainties is describing someone else's house.

The solar installation category on this directory records the first group only — registrations, coverage and services as recorded, with the date each was checked. There are no reviews, ratings or testimonials, and no paid placement. The area coverage pages exist because a Nicosia installer quoting Polis prices a two-hour round trip into the day rate.

Registrations that matter

The entity, not the brand. Cypriot solar companies frequently trade under a name that differs from the registered company. What matters is that the entity on the quote is the one that will invoice, hold the workmanship warranty and still be findable in three years. A check at the Registrar of Companies settles it.

ETEK registration. A grid-connected photovoltaic system is a designed electrical installation, not an appliance, and the chamber maintains the register of engineers entitled to practise. The useful question is not whether a company "works with" a registered engineer but which named person signs, and whether they will attend the property before the design is issued.

Licensed electrical contractor. The connection into the consumer unit, the isolation and protection arrangements and the earthing are regulated electrical work. Mounting rails on a roof is not. Firms that grew out of roofing or general building are the ones to ask which licensed contractor does this part, and whether that person is staff or a subcontractor.

Insurance, with dates. Public liability cover, and cover for the people working at height. The certificate matters less than the period it covers.

Scheme conditions, read at source. Where a residential support scheme is running, the Ministry of Energy, Commerce and Industry publishes its conditions, including any requirement about who may install.

Questions to ask

  1. Who applies for the grid connection, and what happens if it is delayed?

    A net-metering system needs an application, a meter change and an inspection through the electricity network, and that timing sits outside the installer's control. In dense tourist-area grids such as Germasogeia, export applications often trigger a load assessment on the local network, which adds weeks. The useful answer names who submits, what is charged for it, and what happens to the payment schedule if approval is slow.

  2. Which roof, at what orientation, and what shades it in December?

    Cypriot flat roofs are crowded. Water tanks, solar thermal cylinders, parapets, stair enclosures and the neighbour's lift overrun all cast long shadows in winter. A survey done on a laptop from satellite imagery has seen none of them.

  3. How is the array fixed, and how is the waterproofing made good?

    On a flat concrete roof the choice is ballasted or penetrating. Penetrating a waterproofing membrane and reinstating it badly is the most common way a solar installation becomes a damp complaint. The quote should name the method, the sealing system, and who carries the risk if water appears.

  4. What grade are the fixings?

    Directly on the coast — Kato Paphos, Germasogeia, the Larnaca seafront — the air is salt-laden and galvanised or marine-grade fixings are standard rather than an upgrade. Inland in Nicosia this matters far less. An installer who quotes the same fixings everywhere has not thought about it.

  5. How does the equipment reach the roof?

    On the hillside plots above Peyia, access roads limit crane and delivery vehicle size. In the 1970s–1990s apartment blocks of Strovolos the cable run from roof to meter crosses common parts, needing the management committee's consent before anything is drilled.

  6. Who returns when it stops working?

    Three warranties sit inside one quote: panels and inverter from their manufacturers, workmanship from the installer. Only the third depends on the company still trading. Ask what the response commitment is, and what a call-out costs once the workmanship period ends.

What a good quote looks like

A comparable quote is priced per installed kWp and states the DC array size and AC inverter rating as two separate numbers. They are not the same figure, and the ratio between them is a design decision with consequences for summer clipping and winter output.

Beyond that figure, a quote worth comparing itemises the panel model, count and watt-peak rating; the inverter model and rating; the mounting system and its fixing method; DC and AC cabling; isolation and protection; access or scaffolding; the grid application and inspection; reinstatement of any waterproofing disturbed; and the VAT treatment stated rather than implied.

It is equally clear about exclusions. A consumer unit needing an upgrade, roof repairs found once the surface is walked, tree removal, and consents for cable routes through common parts are frequent extras. Naming them in advance is the difference between a quote and an opening bid.

Payments should follow milestones — deposit at order, stage payment on delivery to site, balance on commissioning and handover. The handover pack is part of the deliverable: electrical certificate, as-installed drawing, inverter commissioning data, warranty documents and grid connection paperwork. The generation estimate belongs there too, with its assumptions written beside it — orientation, tilt, shading, soiling losses. An estimate with no assumptions attached cannot be wrong, which is precisely the problem.

Warning signs

A price given only as a monthly figure, or as a percentage of a claimed bill saving, is not a price. It is a finance product with a system attached, and the installed cost is being kept out of view.

A quote naming no engineer, no electrical contractor and no legal entity leaves nothing to check. So does one that will not commit the DC and AC sizes to paper — those numbers are how competing quotes become comparable, and vagueness about them is rarely accidental.

Urgency built around a scheme deadline deserves a look at the source. Scheme conditions and closing dates are published by the ministry; a deadline that exists only in a salesperson's diary is a negotiating position.

A deposit covering most of the contract value before any equipment reaches site transfers the entire risk to the customer. So does a proposal silent on the grid application, which usually means the customer will discover it is theirs to handle.

Payback stated as a promise is the clearest signal of all. Payback on a Cyprus system is driven mostly by what share of generation the household consumes during daylight, and no installer knows that before asking about occupancy.

Common questions

Does this site publish reviews or ratings for solar companies?

No. Listings record registrations, coverage and services as recorded, with the date each item was checked. ### Is planning permission needed for a rooftop system?

The type of installation and the site determine it, not solar as a category. A flush roof-mounted array on an ordinary dwelling is treated differently from a ground-mounted array, from anything on a listed building, and from installations inside protected or coastal zones, where the Department of Town Planning and Housing position and the local authority both apply. Have the installer state in writing which route applies to the address.

How many quotes are worth collecting?

Enough that differences become visible rather than leaving one figure with nothing to compare against. Quotes only become comparable when each is priced against the same array size in kWp and the same inverter rating, so it helps to fix the specification first and circulate that, rather than letting each company design its own system and then comparing totals.

Why is one quote much cheaper than the others?

Usually for identifiable reasons: an inverter undersized relative to the array, a basic string inverter on a shaded roof that needs optimisers, ballasted mounting where fixing was appropriate, standard fixings on a coastal property, the grid application excluded, or access priced as an extra to be raised later. Each is a line item, which is why line items matter.

Do solar companies cover the whole island?

Coverage is a district question rather than a national one. Distance from the main contractor base in Paphos to Polis Chrysochous adds travel time to most quoted day rates, and the same arithmetic applies to Nicosia firms taking work out in Paralimni or Protaras. Service visits are also easier to arrange with an installer already working nearby, which is why coverage is listed town by town.

Registered solar installers

8 companies covering this area.

  • Limassol Electrician 24/7

    Potamos Germasogeias, Limassol

    Limassol Electrician 24/7 is an electrical contractor in Potamos Germasogeias, in the Limassol district. Recorded services include fault finding, consumer units, rewiring.

    • Fault finding
    • Consumer units
    • Rewiring
    • Certification
  • Vascon Solar Experts LTD

    Pera Chorio, Nicosia

    Vascon Solar Experts LTD is an energy supplier in Pera Chorio, in the Nicosia district.

  • Kyriakos Louka & Yioi LTD (Office) is an electrical contractor in the Nicosia district. Recorded services include fault finding, consumer units, rewiring.

    • Fault finding
    • Consumer units
    • Rewiring
    • Certification
  • Bioenergy

    Polis, Paphos

    1

    Bioenergy is a company in Polis, in the Paphos district.

  • ΦΑΝΟΣ ΚΑΡΑΝΤΩΝΗΣ is listed on the Cyprus Energy Service register of certified solar PV installers under registration Γ01/2017, valid to 24/5/2029. The entry covers ΠΑΛΑΙΟΜΕΤΟΧΟ, the nicosia district. Details come from the public register and have not been verified with the business.

  • ΧΑΡΑΛΑΜΠΟΣ ΠΑΝΑΡΗΣ is listed on the Cyprus Energy Service register of certified solar PV installers under registration Γ03/2017, valid to 5/8/2029. The entry covers ΑΓΙΟΣ ΔΟΜΕΤΙΟΣ, the nicosia district. Details come from the public register and have not been verified with the business.

  • ΝΕΟΦΥΤΟΣ ΤΣΙΓΑΡΙΔΗΣ is listed on the Cyprus Energy Service register of certified solar PV installers under registration Γ05/2017, valid to 5/8/2029. The entry covers ΕΡΓΑΤΕΣ, the nicosia district. Details come from the public register and have not been verified with the business.

  • ΣΤΕΦΑΝΟΣ ΧΡΙΣΤΟΔΟΥΛΟΥ is listed on the Cyprus Energy Service register of certified solar PV installers under registration Γ06/2017, valid to 1/12/2029. The entry covers ΛΥΘΡΟΔΟΝΤΑΣ, the nicosia district. Details come from the public register and have not been verified with the business.

Sources

  1. Cyprus Scientific and Technical Chamber (ETEK) — register of engineers — retrieved 2026-07-28
  2. Electricity Authority of Cyprus — connection and metering — retrieved 2026-07-28
  3. Cyprus Energy Regulatory Authority — net metering framework — retrieved 2026-07-28
  4. Ministry of Energy, Commerce and Industry — renewable support schemes — retrieved 2026-07-28

Thinking of doing this?Get up to five quotes, free.

Tell us what you need and we will gather quotes from qualified companies where you live.

Get up to 5 quotes.Free, with no obligation.

Tell us briefly what you need. We gather quotes from qualified companies where you live, so you do not have to ring round yourself.

Free · No obligation · You decide whether to go ahead